A

AMDALAnalisis Mengenai Dampak Lingkungan (environmental impact assessment)
Indonesia's full environmental impact assessment, required for projects with significant environmental impact. Large data centre campuses with heavy power, water and cooling needs should plan for it. Smaller projects may need a UKL-UPL instead.

B

Build-to-suit
A data centre designed and built to one customer's specification, usually against a long-term lease signed before construction starts. Common for hyperscalers. See off-take.

C

Colocation
Renting space, power and cooling in a data centre for your own servers, by the rack, cage or suite. The operator runs the building and the customer runs the IT.

D

Data residency
A requirement that certain data is stored in a particular country. In Indonesia, GR 71 of 2019 requires public-sector electronic systems to manage and store their data in the country. See also the PDP Law.
Direct-to-chip cooling
Liquid cooling in which coolant flows through cold plates mounted on the processors, carrying heat away at the source. The most common choice for dense AI racks. See designing AI-ready data centres for the tropics.

E

Energisation
The moment a new grid connection is switched on and the site can draw power. For a large campus, the energisation date usually sets the whole project timeline. See Grid.

F

FTZFree trade zone
An area with eased customs and import rules. Batam, Bintan and Karimun form a free trade zone, which simplifies bringing in equipment. See Batam.

G

GPUGraphics processing unit
The processor that does most of the work in AI training and inference. GPU servers draw far more power than conventional servers, which is driving the move to liquid cooling. See GPUs.
GPU-as-a-Service
AI compute sold as a service. The provider owns and runs the GPUs, and customers rent capacity by the hour or by contract. Providers often lease data centre space and resell the compute inside it.

H

HGBHak Guna Bangunan (right to build)
The land right a foreign-owned PT PMA normally holds in Indonesia. It allows building on and using land for a fixed term: up to 30 years at first, extendable for up to 20 and renewable for up to 30, under GR 18 of 2021. See the licences behind a data centre.
HPLHak Pengelolaan (right of management)
A management right over land, often held by industrial estate operators or state bodies. Inside an estate, a buyer's HGB is commonly granted over the estate's HPL, so the estate's consent matters for extensions and renewals.
Hyperscaler
A very large cloud or internet company that buys data centre capacity at scale, often through build-to-suit or wholesale leases. See hyperscalers and AI compute buyers.

I

IT load
The power drawn by the servers, storage and network equipment in a data centre, as opposed to cooling and other overheads. Campus sizes are usually quoted in megawatts of IT load.

K

KBLIKlasifikasi Baku Lapangan Usaha Indonesia (standard business classification)
Indonesia's standard classification of business activities. The KBLI codes a company registers decide which licences apply and what it is allowed to do. See Government.
KEKKawasan Ekonomi Khusus (special economic zone)
A designated zone with tax, customs and licensing incentives. Nongsa Digital Park in Batam is one example. Incentives come with conditions, so check them against your structure.
KKPRKesesuaian Kegiatan Pemanfaatan Ruang (spatial use conformity)
Confirmation that a planned activity fits the spatial plan for its location. It comes before building approvals, so it is one of the first things to check on any plot.
kW per rack
The power a single rack of servers draws. Traditional racks often run at 5 to 15 kW. AI racks commonly need 40 kW and some go well over 100 kW. It is the number that drives cooling and electrical design.

L

Liquid cooling
Removing heat from servers with liquid rather than air, through rear-door heat exchangers, direct-to-chip cold plates or immersion. Needed for most dense AI deployments, and well suited to hot climates.

M

MW / GWMegawatt / gigawatt
Units of power. Data centre campuses are sized in megawatts of IT load. The largest AI campuses are planned in hundreds of megawatts or more, and a gigawatt is 1,000 megawatts. See Gigawatts.

N

N+1 / 2N redundancy
Ways of describing backup capacity. N+1 means one spare unit beyond what the load needs. 2N means a complete duplicate system. More redundancy adds resilience, and cost.
NIBNomor Induk Berusaha (business identification number)
The business identification number issued through OSS. It is a company's main business registration, and for some low-risk activities it also serves as the licence.

O

Off-take
A customer's commitment to take and pay for capacity in a facility, usually through a lease or capacity contract. Off-take is what makes construction financeable. See why off-take comes before construction.
OSSOnline Single Submission
Indonesia's online business licensing system. It issues the NIB and takes a risk-based approach, so higher-risk activities must meet further standards or obtain permits before they start.

P

PBGPersetujuan Bangunan Gedung (building approval)
The building approval needed before construction. It replaced the old IMB building permit. A certificate of fitness for function, the SLF, follows completion.
PDP LawLaw No. 27 of 2022 on Personal Data Protection
Indonesia's personal data protection law, fully in force since October 2024. It sets obligations for anyone processing personal data, and adds to demand for capacity inside the country.
PLNPT Perusahaan Listrik Negara (Persero)
Indonesia's state-owned electricity company, which runs nearly all transmission and distribution. Every large data centre connection runs through PLN. See Grid.
PMA (PT PMA)Penanaman Modal Asing (foreign investment company)
A limited liability company incorporated in Indonesia with foreign shareholders. It is the usual vehicle for foreign investors to hold land rights, take out licences and operate a data centre.
Powered shell
A data centre building with power connected and core infrastructure in place, but without the customer-specific fit-out. The customer or operator completes the halls to suit its own hardware.
PPAPower purchase agreement
A long-term contract to buy electricity from a specific generator. In Indonesia, PLN is the main buyer and seller on the grid, so private PPAs for data centres need careful structuring. See clean power for data centres.
PUEPower usage effectiveness
Total facility power divided by IT power. A PUE of 1.0 would mean no overhead at all. In hot climates, cooling design is the biggest lever on the number.

R

RECRenewable energy certificate
A certificate representing a unit of renewable generation, which a buyer can claim against its own consumption. PLN sells RECs in Indonesia.
RUPTLRencana Usaha Penyediaan Tenaga Listrik (electricity supply business plan)
PLN's ten-year plan for new generation and transmission. Recent plans include a large share of new renewable capacity. It is the best public guide to where the grid is likely to strengthen.

S

SLFSertifikat Laik Fungsi (certificate of fitness for function)
The certificate confirming a completed building is fit to be occupied and used. It follows the PBG.
Substation
A facility that transforms electricity between voltage levels and switches it between lines. A large data centre needs spare capacity at a nearby substation, or a dedicated substation of its own.

T

Tier III / Tier IV
Uptime Institute classifications for data centre resilience. Tier III allows maintenance without shutting down. Tier IV adds tolerance to faults. Many customers specify one or the other.

U

UKL-UPLUpaya Pengelolaan Lingkungan Hidup dan Upaya Pemantauan Lingkungan Hidup (environmental management and monitoring plan)
An environmental management and monitoring plan, used for projects below the threshold for a full AMDAL.