Power at scale and renewable energy for data centres

A campus can only grow as far as its power supply. We plan supply for every phase and look for clean power wherever the rules allow.

Gigawatts, 4 of 6

Power for every phase, not just the first.

The first hall of an AI campus might need tens of megawatts. A full build-out can reach hundreds, and the largest campuses are planned in gigawatts. Securing the first block of power is the grid question. Securing the rest, on time and at a predictable cost, is the gigawatts question.

Buyers also care where the power comes from. Global cloud and AI companies have public carbon targets, and many will not sign without a credible plan for renewable supply. Indonesia has real options, from geothermal and hydro to solar, but each needs work from the start.

What we secure

  • A phased plan from first megawatts to full build
  • Renewable supply and energy certificates
  • On-site and captive generation options
  • Cooling and efficiency targets

Where projects stall

Customers increasingly want clean power. Indonesia has some of the world's largest geothermal resources, but getting renewable supply to a site takes planning from day one.

Planning power phase by phase

We build a power schedule that matches the campus plan: how many megawatts each phase needs, when it needs them and where they come from. That schedule then drives decisions on land, substations and procurement.

It also protects the value of the project. Investors pay for capacity that can be delivered. A credible path from the first hall to the full campus is worth more than a large number on a masterplan.

  • Phase loads: IT load and total facility load for each hall
  • Supply sources: grid, on-site and renewable, phase by phase
  • Efficiency: a realistic PUE target for the climate and the cooling design
  • Headroom: margin for denser hardware arriving later
A hydroelectric dam and reservoir in a jungle valley in Sumatra

Indonesia's renewable options

Indonesia holds around 40% of the world's estimated geothermal resources and has the second-largest installed geothermal capacity in the world. Geothermal gives steady power around the clock, which suits data centres well. Hydro adds large-scale supply in parts of Sumatra, Sulawesi and Kalimantan, and solar, including floating solar on reservoirs, is expanding.

PLN's ten-year supply plan, the RUPTL, puts a large share of new capacity into renewables. For data centre owners, the practical routes today include renewable energy certificates (RECs) bought from PLN, green energy products agreed with PLN, and on-site generation where the rules allow. Our guide to renewable power for data centres in Indonesia compares them.

Power-led site selection

For the largest campuses, it can make sense to find the power first and the land second. Sites near major generation, such as the geothermal fields of Sumatra, may offer supply that is hard to find in crowded industrial corridors. The trade-offs are distance from users, fibre and skilled labour.

We test those trade-offs openly. Some workloads, such as AI training, can sit further from users. Others, such as cloud services for Jakarta, need to be close. The answer decides where the campus belongs.

Backup, storage and efficiency

Every data centre needs backup generation for grid outages, and many now plan battery storage alongside it. We look at fuel logistics, emissions rules and how backup plant fits on the site.

Efficiency is part of power planning too. Every point of PUE saved is power that can be sold to customers. Liquid cooling, efficient chillers and good airflow design all help, and they matter more in a tropical climate.

What we check before we call Gigawatts secured

  • Load profile

    IT and facility load for each phase, with margin for denser hardware.

  • Grid headroom

    How much of the full build-out the network can supply, and when.

  • Renewable supply

    Certificates, green energy products and generation sources that could serve the site.

  • On-site generation

    Space, permits and fuel or resource for generation and storage on site.

  • Efficiency target

    A PUE goal that suits the climate and the cooling design.

  • Carbon reporting

    What customers will need to report, and how the supply plan supports it.

What you get

Want a quick read first? The site check scores your project against all six Gs in two minutes.

Check a site against the six
  • A phased power schedule from first megawatts to full build-out
  • A renewable supply strategy covering the options open to the site
  • A backup and storage concept
  • An efficiency target agreed with design partners
  • A power summary that investors and customers can rely on

Questions we're often asked

How much power does an AI data centre need?

It varies widely. A single AI hall may need tens of megawatts, and a full campus can reach hundreds. We size the power plan from the target compute capacity and the number of phases.

Can data centres in Indonesia run on renewable energy?

Yes, through several routes: renewable energy certificates from PLN, green energy products agreed with PLN, and on-site generation where permitted. Which routes fit depends on the site and its timetable.

Why does geothermal matter for data centres?

It produces steady power day and night, unlike solar or wind. Indonesia has some of the largest geothermal resources in the world, which makes it a strong long-term option for campuses with a constant load.

What is PUE?

Power usage effectiveness: total facility power divided by IT power. A lower figure means less power spent on cooling and other overheads. Tropical heat makes a low PUE harder, which is why cooling design matters. See our glossary.

Do we need backup generators if we have two grid supplies?

Almost always. Customers expect the critical load to keep running through any grid outage, so backup generation, and often batteries, stay part of the design.

Next of the six Gs

Government

Licences, zones and the people who approve them.

Have land, power or capital in Indonesia?

Tell us what you have. We'll tell you plainly whether it can carry an AI campus, and what it would take.